DESIGN PARAMETERS AND TECHNICAL CONDITION OF HYDROTECHNICAL STRUCTURES IN THE ZOMIN WATER RESERVOIR

Khasanov Khojiakbar Khamzayevich

Ahmetova Akdidar Kuralbayevna

Kosimjonova Malika Rustam qizi

Keywords: Keywords. Zomin water reservoir, dam, spillway, destructive spillway, natural observation-measurement works.


Abstract

Abstract. Zomin water reservoir is a seasonally controlled reservoir built on a river bed. It was built on the Zominsoy river, located 8 kilometers from the center of the district, in the Zomin district of the Jizzakh region. The reservoir is designed to irrigate 7,820 hectares of land in Zomin district. In order to study the current technical condition of hydrotechnical facilities in the Zomin water reservoir, natural observation-measurement works were carried out. After checking the technical condition of hydrotechnical structures in the reservoir, it was found that there are the following defects: on the upper slope of the dam, from the scythe to the berm, at the mark 916.0 m., no deformation and damage was detected, at the mark 916.0 m, the subsidence of the berm from PK4-00 to PK5÷16 is visible, the covering plates are cracked, at the bottom there are gaps. When built according to the project, they will be 600m. At the 902 m mark, the entire berm was repaired and part of the lower slope was repaired with an area of 1566 m2. In the area of marks 902-909 m, between the marks PK 5÷16-PK 6-00, the slope is broken, the total area reaches 200 m2, on the berm at the mark 888.5 m. there are old concrete fragments of the upper berm and the slope of the dam. The water reservoir and other related and adjacent hydrotechnical facilities were monitored. Based on the results of natural observation-measurement works conducted in order to study the current technical condition of the hydrotechnical structures in the Zomin water reservoir, the technical condition of the hydrotechnical structures in the reservoir was assessed as being in a dangerous state.


References

Bakiev M.R. River bed regulation by cross combined dikes. Study of streams and water sheds of high hydraulic irregularity. XXIV Jahr congress (Madrid) pp 9-13.

Istomina M.N. Kompleksnaya otsenka krupnykh navodneniy v mire i ix negativnykh posledstviy Diss. Ph.D. Moscow 2005 http://www.dissercat.com/content/kompleksnaya-otsenka-krupnykh-navodnenii-v-mire-i-ikh-negativnykh-posledstvii#ixzz2KEdJaIBU

Bakiev M.R. Sovershenstvovanie konstruktsiy, metodov raschetnogo obosnovaniya i proektirovanie regulyatsionnykh soorujeniy, Avtor.dokt.dissert., M., 1992, 57 p.

Bakiev M.R. River bed regulation by cross combined dikes. XXIV JAHR congress Madrid a study of streams and water sheds of high hydraulic irregularity, September 9-13, 1991, MADRID/ESPANA.

Kadyrov O. Sovershenstvovanie konstruktsiy i razrabotka metoda hydravlicheskogo rascheta combinirovannyx damb. Abstract diss. Ph.D. Tashkent 1991 27 p.

Shukurova S.E. Bakiev M.R. Proektirovanie odnostoronnix kombinirovannyx damb. Monograph, Tashkent, 2019, 122 p.

MR Bakiev, TN Tursunov, NT Kaveshnikov Operation of hydraulic structures. Tashkent, 2008, 320 p.

Most read articles by the same author(s)